Solar Farm Infrastructure

Our team collaborates with other specialists to deliver the best outcomes for you.

Solar Infrastructure Land Development

  • Site Feasibility Assessment
  • Due Diligence
  • Preliminary Site Design
  • Stormwater & Flood Risk Assessment
  • Layout Optimisation
  • Internal Road and Accessway Design
  • Earthworks Planning
  • Erosion and Sediment Control
  • Resource consent support

Get your project delivered on time and on budget

Contact Us

Case Studies

Solar Farm – Flood Risk Study

Metis delivered a Flood Study that informed our client of potential flood impacts on proposed site layout and recommended changes to better manage risks

Birches Trading Estate – Flood Mitigation

Following a series of flooding incidents in the Birches Industrial Estate in East Grinstead, Metis were commissioned to investigate the causes of the flooding, undertake options appraisal and detailed design of a preferred option, before leading the procurement phase and contract administration during construction.

Cook Drive Soakage, Whitianga

Metis was engaged by Thames-Coromandel District Council to design roadside soakage trenches in Whitianga.

By submitting this form I agree to my details being used in sole connection with the intended enquiry. Please check our privacy policy to see how we protect and manage your submitted data.