Brownfield Development

Our team collaborates with other specialists to deliver the best outcomes for you.

Civil & Environmental Engineering

  • Infrastructure assessments
  • Site Due Diligence & Feasibility
  • Unitary / District Plan compliance
  • Capacity Constraints Assessments
  • 3 Waters Engineering and Network Design
    • Wastewater Network Design
    • Watermain Network Design
    • Stormwater Network Design
    • Stormwater Management, Storage & Treatment
  • Flood Risk & Overland Flow Management
    • Flood Risk Assessments
    • Overland Flow Path Assessments
    • Flood Management Solutions
  • Earthworks
  • Driveways and Crossings
  • Stormwater Management, Storage & Treatment
  • Resource Consent, EPA, and Building Consent Support
  • Construction Monitoring
  • Design Peer Reviews
      • Flood risk & overland flow management

Get your project delivered on time and on budget

Contact Us

Case Studies

Birches Trading Estate – Flood Mitigation

Following a series of flooding incidents in the Birches Industrial Estate in East Grinstead, Metis were commissioned to investigate the causes of the flooding, undertake options appraisal and detailed design of a preferred option, before leading the procurement phase and contract administration during construction.

Ilford Town Centre Phase II

Metis were appointed to review the existing Phase 2 design and implement it.

Linden Lodge – Flood Risk Assessment and WSUDs

Metis developed a Flood Risk Assessment and accompanying Sustainable Drainage Strategy to facilitate improvements to the Linden Lodge Kennels & Cattery, a site located within a functional floodplain.

By submitting this form I agree to my details being used in sole connection with the intended enquiry. Please check our privacy policy to see how we protect and manage your submitted data.